Ridgecast Works 应用工程: +44 (0)114 244 0180
Ridgecast Works/ 设备/ RC-VF1100 振动棒条给料机
Machine · 给料

RC-VF1100 振动棒条给料机

把原矿均匀送入颚破;100 mm 棒条先把细料筛出,不进破碎腔。

RC-VF1100 vibrating grizzly feeder (placeholder photograph)
Purpose

把原矿均匀送入颚破;100 mm 棒条先把细料筛出,不进破碎腔。

Capacity — 400–600 t/h

技术规格

槽宽 1 100 mm
棒条间距 100 mm
产能 400–600 t/h
工艺阶段 初碎前给料
首台交期 12 周
首台交付内容 一套衬板与尺寸核对单

Send the rock type. Get a first view on t/h.

Tell the applications desk the rock, the target product, and whether it's a pit, a decline, or a quarry. An engineer replies within three working days with a first view on tonnage and a first-steel date.

联系工厂