Ridgecast Works/
Machines/
RC-C900 Cone Crusher
Machine · Secondary crushing
RC-C900 Cone Crusher
Takes jaw product down to finished sizes, closed with the RC-S2460 screen.
Purpose
Takes jaw product down to finished sizes, closed with the RC-S2460 screen.
Capacity — 220–310 t/h at CSS 22–32 mm
Technical specifications
| Mantle diameter | 900 mm |
|---|---|
| Circuit | Closed circuit with RC-S2460 |
| Process stage | Secondary crushing |
Send the rock type. Get a first view on t/h.
Tell the applications desk the rock, the target product, and whether it's a pit, a decline, or a quarry. An engineer replies within three working days with a first view on tonnage and a first-steel date.