Ridgecast Works/
Machines/
RC-S2460 Triple-Deck Screen
Machine · Screening
RC-S2460 Triple-Deck Screen
Cuts cone product into sale sizes and returns oversize to the RC-C900.
Purpose
Cuts cone product into sale sizes and returns oversize to the RC-C900.
Capacity — Up to 400 t/h feed · depending on cut
Technical specifications
| Screen size | 2.4 × 6.0 m |
|---|---|
| Decks | 3 |
| Circuit | Closed circuit with RC-C900 |
| Process stage | Screening |
Send the rock type. Get a first view on t/h.
Tell the applications desk the rock, the target product, and whether it's a pit, a decline, or a quarry. An engineer replies within three working days with a first view on tonnage and a first-steel date.