Ridgecast Works ● Forge Park Applications desk: +44 (0)114 244 0180
Ridgecast Works/ Machines/ RC-C900 Cone Crusher
Machine · Secondary crushing

RC-C900 Cone Crusher

Takes jaw product down to finished sizes, closed with the RC-S2460 screen.

RC-C900 cone crusher
Purpose

Takes jaw product down to finished sizes, closed with the RC-S2460 screen.

Capacity — 220–310 t/h at CSS 22–32 mm

Technical specifications

Mantle diameter 900 mm
Circuit Closed circuit with RC-S2460
Process stage Secondary crushing

Send the rock type. Get a first view on t/h.

Tell the applications desk the rock, the target product, and whether it's a pit, a decline, or a quarry. An engineer replies within three working days with a first view on tonnage and a first-steel date.

Contact the works